Work has begun! The organ was removed and transported to our shop for restoration on the 17th of October. This is a before picture of the organ chamber. The organ will get re-engineered and setup at our shop prior to installation. A new solid state relay and MIDI system will be installed. Installation in the church is planned just prior to Thanksgiving. Check back frequently for updates.
Saturday, October 20, 2007
Work begins
Work has begun! The organ was removed and transported to our shop for restoration on the 17th of October. This is a before picture of the organ chamber. The organ will get re-engineered and setup at our shop prior to installation. A new solid state relay and MIDI system will be installed. Installation in the church is planned just prior to Thanksgiving. Check back frequently for updates.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment